LEEDS

Haines Assisted Living Facility

HAINES ASSISTED LIVING FACILITY, HAINES (2009)
Client:City and Borough of Haines
Services Provided:  Project mechanical engineering as a sub-consultant for design-build and permit ready construction documents and construction services of the Assisted Living Facility in Haines currently under construction.  Project is currently under LEEDS submittal and review with end award hopeful of Silver designation.  Mechanical systems included heat recovery ventilation and exhaust for all apartments and central kitchen area, domestic water, wet and dry sprinklers, electric cove heaters with future hydronic radiant floor heating, and electronic controls. Provisions for future ground source geothermal systems were included.  Approximate total mechanical construction cost $450,000




HARBORVIEW ELEMENTARY SCHOOL RENOVATION, JUNEAU (2007-2009)
Client:Juneau School District
Services Provided:  Mechanical design, contract documents, construction services, and inspections of mechanical systems for additions and modifications to Harborview School.  Project included major renovation to entire school with all new heating, plumbing, and ventilation systems.  A new complete building automation system renovation from pneumatic to direct digital controls will also be accomplished. Project was designed and being constructed for LEEDS certification.





GLACIER VALLEY ELEMENTARY SCHOOL RENOVATION, JUNEAU (2007-2009)
Client:Juneau School District
Services Provided:  Mechanical design, contract documents, construction services, and inspections of mechanical systems for additions and modifications to Glacier Valley School.  Project includes major renovation to middle of the school for Penthouse Fan Room addition resulting in reconfiguration of several mechanical ventilation systems.  Design included a phased construction project with the Fan Room Penthouse constructed in the first summer, 2008, school will then be occupied during the 2008-2009 school season, and then the remainder of the project completed in the second summer, 2009.   Project was designed and being constructed for LEEDS certification.   A new complete building automation system renovation from pneumatic to direct digital controls was also accomplished.





CORDOVA COMMUNITY CENTER (2008-2009)
Client:City of Cordova
Services Provided:  Mechanical design and documents of mechanical systems for a community building housing the city administration offices, library, museum, and theater for Cordova.    Mechanical systems included oil-fired boilers, variable speed heating water circulation, variable speed ventilation, commercial kitchen facilities, radiant ceiling heating, cistern stored water for cooling, domestic plumbing, sprinkler, and direct digital controls.  Other features include dual flush toilets and low water consumption plumbing fixtures.  Project is currently at 95% design completion awaiting future funding.   The project was designed and being constructed for LEEDS certification.

EVERGREEN BUILDING, JUNEAU (2008)
Client: Paul Voelckers
Services Provided: Prime Consultant for LEEDS office/apartment building providing mechanical engineering for a design-bid-build construction project. Systems included: heat recovery ventilation, electric heating, domestic plumbing, and low voltage controls. Project was awarded a LEEDS silver designation.